MAN and Machines

It’s been a fair while since I have been able to do a good blog on the logistical magician that is Steve Marsh of Express fame. Recently the Marsh MAN has been seen frequenting the A55 and the green roads of Ireland, in fact this week he has two trips to the Emerald Isle booked. Last week however it was a different story. A lovely little bit of logistical excellence with minimal empty running. Load Northern England, tip and load Italy, then back to Northern England.

Marshy is based near Warrington in the North West of England, not a million miles from Liverpool. The job started on Thursday, with the loading of a transformer housing from Sherburn in Elmet in Yorkshire. The little MAN TGL was built to Marshys own strict requirements and although it added a fair amount of weight, the importance of a sliding roof on the 12 tonner has been proven over and over. The truck has everything required to load a large but sensitive item through the roof and transported over 1200 miles to its destination. Once loaded it’s off down the A1, A14, M11, M25, M2, A2 to Douvres. Boat to Calais and then off down through France, up and over Mont Blanc and into Italia.

Break time in the Alps

Once into Italy, time was ticking for Marshy to take a weekend break. Having got most of the way down towards Subbiano in Tuscany, Steve parked up Saturday afternoon in the last services before the delivery point to take a well earned rest through to Monday morning. Up and away Monday to Subbiano, tip the transformer housing off for testing and then straight on to the reload. What a nice little reload it was! So a little empty running from Subbiano upto Comezzano-Cizzago near Brescia, just the 246 miles, to reload a small aeroplane back to the UK, loading Monday evening.

Loading finished Monday PM, then it was back onto the autostrada and head towards the Blanc and a full retrace of his steps back to Calais. A couple of stops along the way to make sure the plane hadn’t moved were required by Mr Conscientious as you can imagine. The plane was only 300kg all in, made from carbon fibre and fitted with a litre 2 litre engine. The hardest part of the load were the wings according to Marshy as they were so light and couldn’t rub on each other.

#volvogate

Another Calais Dover crossing and then back up North to Kirkby near Liverpool. The plane was delivered on Thursday last week to a flying school on a farm, so the final stretch was probably the hardest part, down through a farm track, plenty of bumps and pot holes and not to mention the low trees! All said and done, it’s all in a days work for the little MAN and it’s pilot. Another round trip complete and another couple of happy customers. The trucks capabilities, the sliding roof, the tail lift to load and unload the plane…..experience is key people, experience… is… key…

A little mileage breakdown just for fun? Yea go on then, why not!

  • Empty – Warrington to Sherburn in Elmet = 72 miles.
  • Loaded – Sherburn in Elmet to Subbiano, Italy = 1230 miles.
  • Empty – Subbiano to Comezzano-Cizzago = 246 miles.
  • Loaded – Comezzano-Cizzago to Kirkby = 1002 miles.
  • Empty – Kirkby to Warrington = 19 miles.

To sum up then;

  • Total miles = 2569 miles.
  • Loaded = 2232 miles.
  • Empty = 337 miles.

Before you truck off, why not leave a comment....

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s